-
SIGMA7 completes new office search
10/1/2017
Our extensive office search process culminated with the selection of in the ‘Mercantile Building’ at 10 East 40th Street between Madison and Fifth Avenues.
-
SIGMA7 Design/Build team selected for Connecticut Capitol Area System Thermal Plant
07/1/2017

After a nearly yearlong qualifications and selection process with the State of Connecticut Division of Construction Services, SIGMA7 and Bartlett Brainard Eacott (designer and builder respectively) were selected to design and implement the new Capitol Area System Thermal Plant.
-
SIGMA7 presents at 7x24 Exchange Spring 2017 National Conference
06/1/2017

Bob Rouleau and Marc Figelman presented a case study on one of our enterprise level data center projects in the grand ballroom of the Hilton Orlando Bonnet Creek Resort.
Page 2 of 2
Page 2 of 2



